Archive Centre Spotswood

Another quality project by AAH Contracting

Location

Spotswood, Victoria

Completion

July 2019

Safety

Highest Safety Standards

Download

Download The Case Study

Project Overview

Archive Centre, Spotswood is a VicTrack asset property that AAH was contracted to remediate. Works included asbestos removals and floor grinding throughout the property.

  • Remove all asbestos containing materials up to ‘non structural disturbance’
  • Grind up to 100m2 of contaminated flooring
  • Encapsulate divets to deep to grind
  • Remove contaminated ceilings and grid work

Critical Factors/Challenges

The challenges and critical factors to successfully complete the works were.

  • Guaranteed deadline, “works must be completed within 5 weeks”
  • Additional concrete had to be laid to encapsulate old track area within the existing time restraints

Outcomes

  • All works were completed within timeframe
  • Met all of client’s requirements
  • Works were completed in 3 sections
  • 0 safety incidents
  • Over 800 man hours worked