Chandler Highway Alphington
Another quality project by AAH Contracting
Location
Alphington, Victoria
Completion
April 2019
Safety
Highest Safety Standards
Download
Download The Case Study
Project Overview
Between 2017 and 2019, Chandler Highway underwent an upgrade to widen the road to 6 lanes. AAH Contracting was contracted to remediated the contaminated soil throughout the areas.
- Remediate asbestos contaminated soil
- Civil works
- Removal of asbestos contaminated pipes
Critical Factors/Challenges
The challenges and critical factors to successfully complete the works were.
- Removing asbestos contaminated soil at waters edge without cross contamination
- Working in close proximity to public roads and parklands
- Co-ordinating works around multiples trades at a time
- Conducting asbestos removal in conjunction with civil works
- Removing pipes from beneath a 20m tall bridge above waterways
- Keeping stockpiles maintained and safe
Outcomes
- The job was completed in sections so there was minimal disruption to construction works being completed by other contractors
- 10,000s of tonnes of waste were removed from site and taken to EPA disposal facilities
- 10,000s of of hours worked across 20 months to complete works
- 50+ internal staff utilised across the project
- 0 safety incidents
- AAH received safety/on site awards for their achievements