Eastern Treatment Plant Bangholme
Another quality project by AAH Contracting
Location
Bangholme, Victoria
Completion
April 2019
Safety
Highest Safety Standards
Download
Download The Case Study
Project Overview
Located in Bangholme, the Eastern Treatment Plant uses innovative processes to turn sewage into Class A recycled water. AAH was contracted to conduct a clean up of the internals to one of their tanks.
- Internal clean up of tank following from a sandblasting incident that inadvertantly disturbed asbestos contaminated materials
- Removal of asbestos gaskets from pipework
- Removal of asbestos mastic to wall and floor joints
Critical Factors/Challenges
The challenges and critical factors to successfully complete the works were.
- Tank access. Materials and waste had to be craned in and out of the tank
- Arrestance efficiency of filter cloth. We had to ensure that a minimum efficiency of 97% at 5 microns was reached during the filtration process
- Removal of splattered patches of asbestos mastic outside of the wall and floor joints
- Works to be carried out in restricted space (confined)
- Removal of contaminated water through a filtration system
- 2 way radio system in place
Outcomes
- All works completed successfully
- Clearance certificates issued by independent hygienist
- 0 safety incidents
- 726 man hours worked to complete works